Dragon Bridge is 666m long, 37.5m wide and has six lanes for traffic. It opened to traffic on March 29, 2013, at a cost of nearly VND 1.5 trillion dong (US$88m). The bridge was designed by the US-based Ammann & Whitney Consulting Engineers with Louis Berger Group. Construction was undertaken by Company No. 508, an affiliate of Civil Construction Engineering Corporation No.5, and Bridge Company No. 75.
Main span was completed on October 26, 2011. The bridge was opened to traffic on March 29, 2013, the 38th anniversary of the liberation of Danang City. This modern bridge crosses the Han River at the Le Dinh Duong/Bach Dang traffic circle, providing the shortest road link from the Danang International Airport to other main roads in Danang City, and a more direct route to My Khe Beach and Non Nuoc Beach on the eastern edge of the City. The bridge was designed and built in the shape of a dragon and to breathe fire and water.